I have a Jira Structure board setup to track the work for our domain architects. Issue types in use are Tasks, Epics, Features, so this means different workflow states. I'm using the TargetStart fi...
We are running Jira at our company, and we are using user certificates for authentication (we don't use personal access tokens). How can I setup the Visual Studio Code extension for Jira to leverage...
I want to be able to search for all test issues linked to all stories which are returned in my "All Stories" filter. Any ideas how this can be accomplished? Thank you! We do have JQL Search extension...
Detection phase fields holds Functional and Technical values for "X" project and "AB" project required Regression, UT values for same field (Detection phase)
Hi, I'm using the Jira insights function to check the stuck,blocked,flagged issue in board or sprint. I notice that in stuck part, there is a tip about '85% of the time, issues have moved out of this...
Getting error "You are not authenticated. Authentication required to perform this operation." when try to create projet on jira altassian. all the basic authorisation is correct still getting n...
I have asked a similar question before a few years ago but I am still confused and cannot work it out. I need to block a status transition (Resolved) based on whether a value is present in a custom ...
Hey there, when pasting a url to a JQL-search into an issue desription it automatically gets rendered into a cool smart-card with predefined columns like so: Before I stumbled upon this feature...
Since three days we have an issue that the Jira ticket number changed. So a ticket was created, got an incremental number, now that number has changed. referencing a ticket in a comment sho...
Jira user not able to change his profile photo
I have configured the project to "Default Assignee = Unassigned" when issues are created. I have tried to two different automation rules to assign issue based on (1) issue type and then assign...
I want to check on my completed sprints. Please suggest how can I see my completed sprints?
Hello! Maybe these are dumb questions but i always struggle with this: 1) If i have 10 tests with the same precondition (login for example), is it better to create a precondition with login ste...
I am not able see icons for Priority field and issue types. Instead, written name of icon type is appearing at the place of icon. other team members are able to see them. see yellow highlights below....
Hi, What is the best approach of ratio calculation that is depend on 2 CF of single list? For example: user A ======= TASK#1: MM = 3 TASK#2: MM = 0.8 CFx = 4 (const.) => t...
Dear all, I have a case where I need to create a certain amount of parent issue and their corresponding child task, this using Autmation. I have quite many parents and tasks to create and doing tha...
Hi All! I would like to gain better understanding of the roles and responsibilities within the projects section to better determine the roles which we would be providing. Where would I be ab...
Hello, I'm in the middle of thinking about a new organization for our company. We're integrating the Atlassian stack more and more and I'd like to build a solid base from the start, but we have a lo...
Hi Team, I do have URL to my Jira Advanced Roamap, when someone opens it and applies any filter - view is changed; Later on when the same user open JAR clicking URL it opens with already app...
I want to create a filter using JQL (Jira Query Language) functionality to automatically sum the Story Points of subtasks into tasks and then sum the tasks into Epics. Or some automation.
I created a rule to measure the current date time against a target completion date but it seems that my results are being roundup somehow. {{"Need By Date".diff(now).hours.abs}} It seems to be work...
Hello, I'm trying to update single select custom field with new option each time new sprint is created in a selected scrum board. My reference is Atlassian developers guide at: https://develo...
Hello, I hope you are able to help me. I have tried to solve my question on the Atlassian Community site. But have only gotten half-ways. Add an additional issue type to an existing projec......
There are 2 lines in JIRA's control chart. Red line: average time Blue line: moving average period Based on these two lines, can we evaluate the team's performance? And what are the different mea...
User | Count |
---|---|
68 | |
67 | |
62 | |
18 | |
17 | |
16 |
Subject | Author | Posted |
---|---|---|
2m ago | ||
22m ago | ||
yesterday | ||
yesterday | ||
yesterday |