Hi, I want to use live fields with Kepler Custom Fields Pro. I am using it as a Single Autocomplete. I have managed to watch my KCF+ field like this: lfWatch("customfield_10700", {"issueType...
Hi We have 14 screens in JIRA which are shared among projects. We want to hide a field for a particular projects from those 14 screens and it should be visibl...
This question is in reference to Atlassian Documentation: Administering JIRA Software I am admin in jira, but not able to see below options- Not able to see Administration > General Configur...
after install "AM utils" successfully, i found i cannot use JQL issuesSubtasks,issuesParents. i want to list all subbtasks of critical parents, my JQL is "issuesSubtasks(priority=Critical)", and i ...
Hi team, I have a Subversion ALM plugin in my Jira instance, is it possible that when I create an issue, I can assign a specific file in my subversion repository to a specific user?
Upload works fine however doesnt ask for a specific issue type... which is a problem as i need to upload to different issue types... any reason behind this or way to fix it?
Dear all, I'm JIRA administrator in our project and we're using 4.0.1 version. Could you tell me JIRA table name that I can see the last login date of each user? Although I can see the login det...
I have my JIRA instance secured with a self-issued certificate. Application links to Stash, Crucible/Fisheye and Bamboo work fine (those tools are also secured with a self-signed certificates). I can...
I'm trying to close tempo timesheet every weekend in order to stop people logging or editing the previous week. I have tried to use tempo scheduler. Unfortunately, it does not work properly on our lo...
Need to create workflow condition for issues that have code. All code has been reviewed - can transition Code is not reviewed - requires a mandatory comment to transition The&...
I am trying to install JIRA on our server, but it so far it has been quite a nightmare... Multiple times during the installation, we got 504 error and sometimes 502 error. When we get 502 the server...
This question is in reference to Atlassian Documentation: Getting started with JIRA Software Hi, I just created a new Bitbucket account and a new JIRA site. How do I connect them? ...
Hello, are there a way to send reporting either daily, weekly, monthly to more than one email address?
Hi, I've created a new field called "Developer build fix" which is intended for the developer fill in before placing the bug to QA review for the QA to regress the issue. This new field...
If I move a ticket to anther project, it removes all associated Gerrit reviews with that ticket. Is it possible for this information to be maintained on the ticket while moving between projects? Is t...
Hi There, I'm trying to import a large JSON file (500+ MB) into the JIRA system. I had to change the system setting attachment file size to 500+ MB in order to load the JSON file, but after th...
We use story points for most things, but for escalations we would like to keep track of the time spent on the work. We always use bugs or tasks for escalations, but not all bugs or tasks are es...
Is it possible to reorder test cycles? I had the following with test scripts allocated: Test Cycle 1 Test Cycle 2 We have had to add "Test Cycle 1a" and this led to the following order in...
...Bcustomer%2BI%2Bneed%2Bto%2Bsee%2Bthe%2BBAE%2BSystems%252C%2BHawk%2Band%2Bmy%2Blogo%2Bin%2Bthe%2Bheader%2Bso%2Bthat%2BI%2Bcan%2Bunderstand%2Bthe%2Bscope%2Bof%2Bthe%2Bportal&permissionViolation=true' d...
In my release cycle, testing time is long enough, that developer is starting to fix bugs that were found during QA testing. It's possible to have a task in two status, like "open" for developer and "...
I have used DVCS to smart commit between JIRA and Bitbucket for almost a year. It has worked great up until the last few weeks. Now, when I commit to Bitbucket with a Smart Tag, the update doesn't ha...
This question is in reference to Atlassian Documentation: Project shortcuts Is there a way to view a project in a calendar view?
We don't use Agile in our shop and now it appears we are running JIRA Software. Can I fall back to JIRA CORE without increasing costs at the 1st of the year? If so, how do I go about handling this?&n...
Hi, I have 2 check-box fields and want validate both of them in a transition. EX: in order for a test to ramp up, we need 2 different approvals. If A's approval is missing, then generate error messa...
| User | Count |
|---|---|
| 59 | |
| 23 | |
| 17 | |
| 15 | |
| 13 | |
| 8 |
| Subject | Author | Posted |
|---|---|---|
| 20m ago | ||
| yesterday | ||
| yesterday | ||
| yesterday | ||
| yesterday |