First off - I converted the project from a basic kanban type to a scrum type, which may have something to do with the problem I'm seeing.
I've created a sprint, but, in the board, some of the issues don't show as cards -- they show as a single line that spans all columns (like in the backlog). They show the status in an outlined box after the item id.
I notice two things:
Do one of these conditions trigger this behavior?
Thanks,
rickb
Ok, it's the subtasks that are doing it. Plus the subtask is getting pulled into the sprint -- I think I read something in the docs that subtasks could not be split.
So, ok -- I'll get rid of the subtasks (I seem to recall Atlassian was real resistent to incorporating them, way back when I was using JIRA before.)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.