I want to load Issues into Jira Portfolio out of an Excel file and later on update them. We have to do this several times, because we are in a basic phase of the project.   Two problems I am phasing

  1. I try to update existing issues in Jira, every time new issues are generated
  • It looks like I can generate links to Parent Initative
  • Attached the example CSV file and the Map Field file

 I try to load values into the fields  into Jira Portfolio

  • Attached csv.jpeg images show the CSV file (green works without problems) 
  • The config1 to 3.jpeg shows the config3.JPGconfig2.JPGconfig1.JPGcsv.JPGimport mapping