Hi,
I am testing out the Advanced Roadmaps. I am struggling to configure something and any help would be greatly appreciated.
I have enabled the "Feature" issue type, and added in as a level above Epic. I can add Epics underneath Features, but not Stories or any other type of issue type.
In the spirit of Scrum, I would like to be able define Stories, and only make them Epics if they are big enough to span more than a sprint worth of work. I don't want to have to create an Epic for every piece of functionality, and have some epics with only one story.
How can I drag and drop Stories under Features, as well as Epics?
Thanks
Jon
Sorry, I just figured it out.
The next level down is just called "Epics" You can select multiple issue types to be in that level.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.