Is there a way within Jira or possibly with an add-on that will allow me to find the total time an assignee has spent on tickets for a specific project?
Is there any time roll up for each assignee for the entire project based on all of the logged time within that project?
Thanks for this information, I'm assuming there isn't a way to do this without an add-on.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I'm trying the apps now, but I also saw this thread, which still doesn't give an answer: https://community.atlassian.com/t5/Jira-Software-questions/get-spend-time-in-my-project-between-two-dates/qaq-p/1680829