Hi!
Is there a way to create read-only custom date field that will be calculated based on average Lead time?
In control chart I can see average and rolling average Lead time.
And I'd like to have an automated custom field that will show something like:
Date of transition to To-Do from backlog + Average lead time.
That will give a kind of estimated delivery date.
Is that possible?
Thanks in advance!
Scripted Custom fields is something which you can use. I use them quite a lot for displaying values which are calculated based on the issue data. This feature is part of the script runner plugin. It's a paid plugin and comes with tons of features. More details here
https://scriptrunner.adaptavist.com/5.0.4/jira/scripted-fields.html
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.