Use Structure in Portfolio Roadmap (Link [Portfolio Epic] > [Epics])

Toni S May 28, 2020

Hello everybody,

how can I adjust the Structure in my Portfolio Roadmap in Jira?

I have Portfolio Epics that are linked to Epics (via realized by). For organizational reasons, we don´t use Initiatives. Therefore, a parent-child-connection has not been created.

The issue types are correctly represented in the hierarchy in Structure.

Structure.jpg

I would have the same representation in the Portfolio Roadmap. However, the Epics are shown there as "issues without parent".

Portfolio.jpg

 

Is there a way to get Epics pinned directly under the Portfolio Epic (without Initiatives) in my Portfolio Roadmap?

0 answers

Suggest an answer

Log in or Sign up to answer