Hi!

I've just upgraded to JIRA 4.4 from JIRA 4.2, and I notice that on the main issue view, the simple bar graph that used to display time tracking estimates (e.g. the estimate of effort, the time logged and time remaining) has gone missing. I didn't see anything about this in the upgrade notes for either 4.3 or 4.4.

Is this something that's simply been removed, or is there something that I need to do in order to get this graph back? This was a really handy way of quickly seeing the progress on an issue, so it would be great if it's possible to restore it.

Thanks!

Andrew

2 answers

1 accepted

1 vote
Answer accepted
Andrew Hill
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
October 30, 2011

Ah! It turns out that Minyaa was to blame here (although for some reason, my SDK version of JIRA 4.4, which does not have Minyaa installed, also does not have the time tracking graphs present). Removing Minyaa resolved the issue - our production JIRA instance has time tracking graphs again.

0 votes
Vincent Thoulé
Rising Star
Rising Star
Rising Stars are recognized for providing high-quality answers to other users. Rising Stars receive a certificate of achievement and are on the path to becoming Community Leaders.
November 15, 2011

Hi Andrew,

Minyaa introduces a custom permission in order to show/hide time tracking field.

It is why the graph was not visible.

Vincent