In the Backlog of my Scrum Boards I have a vertical aligned Epic-Tab on the left side:
How can I enable this on my Kanban Board?
Regarding to this guide it should be possible.
Further I can't create an Epic via the backlog:
But I am able to create an Epic via the button "create" in the top navigation.
Thanks for your answers :)
You need to be a board administrator. Then you can go to you board configuration and toggle a switch to enable the Epics panel. It’s a global setting that affects every user of the board.
Thats it, thank you very much, I found it. :)