Hey there -
Recently installed Estimates, but the totaling at the bottom of the sprint correlates to days somehow, rather than the minutes/hours needed.
How can I change this setting?
Because you have more than 8 hours in the sprint.
It is a sum of the estimates. Jira is making the total more human readable - most of us grasp "days/hours/minutes", but struggle with blocks of minutes. 480 minutes for example - not at all intuitive (Despite being a familiar standard working day in the West)
You can swap this in Admin -> Time Tracking, but generally most people will prefer "1d 6h 10m" to "850 m"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
That's what I was looking for. it's easier to look at since we work on a time and materials basis, so scoping out sprints is based on the estimated hours allotted per engineer and the stories.
you can do, 15.50h -- for me, this is ideal.
thanks for your help!