I have tried a lot of different ways to sum up the total story points to an epic based on previous questions and resolutions however unfortunately I'm still missing something and can't get my totals to add up in the epic.
I have set the following rules for automation:
The automation rule says that everything has passed however the sum of the story points are not being updated in the epic:
Hoping someone can help point me in the right direction. Thanks
If your using Jira 7.4 or above you have kanban backlog version.(https://confluence.atlassian.com/jirasoftware/jira-software-7-4-x-release-notes-902079634.html?_ga=2.232602911.1214476760.1540802666-2119825796.1524817237)
Hope changing the workflow won't cause any trouble as we have both kanban and scrum option while creating boards.
And one thing check with the issue types the need to be added for Kanban project type.
Cheers
Hi @Andre Wiggins there's no need to recreate the project as you will loose every issue and configuration. Just create another workflow with issue types and try until they feel confortable. The issues will remain and just the config will change.
Cheers,
David
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hey Andre,
It should be easy enough to fix in your current project.
The only difference should be that you will need to create Kanban boards instead of Scrum boards.
To create a Kanban board just follow this guide: https://www.atlassian.com/agile/tutorials/creating-your-agile-board
You may also need to make some changes to the workflow to meet their needs, so here is the guide on that as well: https://confluence.atlassian.com/jira064/configuring-workflow-720412524.html
Hope this helps,
Tyler