Hi all,
Any leas on how to have two fields "Story Point" in a story, I need it to estimate DEV and QC separately. Can I use the existing fields "Story Point" and "Story Point Estimates" if not can I create a customized field?
Thank you
I think the following two bug reports may be related to your issue:
- https://jira.atlassian.com/browse/JRA-25568
- https://jira.atlassian.com/browse/JRA-25793
You could login, vote for the bug to be fixed and watch the pages for future updates.
Have a look through the JIRA bugs in jira.atlassian.com for issues marked as affecting 4.4 and 4.4.1 and see if these issues are already reported. If not, log them there.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.