I have a complexity field with options Low, Medium and High and cost is based on the complexity, low = 10$/hour, medium = 20$/hours and high = 30$/hour
In structure I have create a formula column to show Σ Tempo Work Logged for a specific date range
I want the cost in another formula column based on the Σ Tempo Work Logged formula column and the complexity of the issue. Kindly help.
Hi Quentin,
this cannot be done out of the box, but you might want to check:
https://marketplace.atlassian.com/apps/1218533/pageprinter-for-jira-to-confluence
Best
JP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.