You're on your way to the next level! Join the Kudos program to earn points and save your progress.
Level 1: Seed
25 / 150 points
Next: Root
1 badge earned
Challenges come and go, but your rewards stay with you. Do more to earn more!
What goes around comes around! Share the love by gifting kudos to your peers.
Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!
Join now to unlock these features and more
The Atlassian Community can help you and your team get more value out of Atlassian products and practices.
From which version is this applied in Jira Server - -"An Epic cannot be linked to another Epic"
we have found users have succeeded in version v8.12.0 linking an Epic to another Epic
I have seen the warning message in certain recent versions(including in the Cloud)
1. as of which Jira Version is this implemented
2 what would you suggest in unlinking the links already in place
3. Does anyone know if Elements Copy & Sync addon can correct this?
Hey @Eleanor Kerman,
I'm the Solution Engineer at Elements.
Atlassian does not allow us to do this, this limitation is imposed on us in Jira and I don't think any application can get around this constraint.
By the way, I would like to enlighten you on how our application works:
Does anyone know if Elements Copy & Sync addon can correct this?
Our application can link tickets together but only if they are created by Elements Copy&Sync. So if both Epics are already created, the option provided by our application may not fit your use case.
Let me know if you need more assistance, if you have any other questions or if you want to do a 1:1 call to exchange about your use case.
Kinds regards,
Armand
It's quite old. Certainly since Jira 7.0 and I have a feeling the error message actually implemented a lot earlier, as the Epic-link field hasn't been addable to Epics since locked fields were introduced.
You can link between Epics with issue links, but the warning is about linking an Epic to another with the Epic-link field, as that's nonsense (Epics can't contain Epics, and that's what the Epic-link field is saying)
Because of the way Epic-link is implemented though, you can create them in some cases - if you create a non-Epic issue, give it an Epic link and then move it to an Epic, it will carry the hang-over with it.
You can reverse that - move it back to an issue, remove the Epic link as you'll now be able to get to it, and then move it back to an Epic again.
The other way to do it is have an admin "unlock" the field and add it to Epics. If that has been done, then the field should now exist on Epics and be editable, but possible mandatory - if it's still unlocked, you'll be able to make it optional in the field configuration for Epics, then you'll be able to edit the Epics that have it and blank it out. Then you should get the field removed from the Epics and locked again
(If an admin unlocks a field like this, you should be considering getting them some proper training - they've done something bad - the fields are locked to prevent this sort of mistake)
I don't know about Elements copy and synce, being able to fix it, I don't think it can because of the config. Scriptrunner would be able to blank out the field though.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.