Within a Structure report, I want a single column that highlights when issues have been either in a "to do" status for over 30 days in a "in progress status" for over 60 days.
This is relatively simple to do with JQL as I can just use the changed operator, however I am relatively new to Structure so am struggling to figure out how this translates.
I have figured how to use the time in status column to provide the duration that an issue has been in a status, although even this is not accurate as I am not interested in the cumulative total duration of time each issue has spent in the specific status.
What I'm essentially after is something similar to the below, but I'm struggling with the correct syntax for comparing two durations:
If (timeintodo > 29 days, "stuck in to do", timeinprogress > 59 days, "stuck in progress")