Hi all;
I currently have several projects all linked together, and I have created a master project, so I can have visibility on all the projects. That board, contains links to other projects, and are all estimated by man-hours as opposed to story points.
The master project board, still shows "Original Estimate", while all the linked Jira's have estimates. Is there a way it can be summed up based on the linked issues, or does it need to be done manually, but going into each linked Jira, and adding up the estimates.
Thanks in advance, as I'm really hoping for an automated way or function.