I wander if I can use the Kanban project functionality for the production flow. For example, to assemble a table, I'll need 3 pieces of wood, 8 bolts, and a few pins. Material stock will be reduced. By the time everything was assembled, the table's stock had increased. Which Atlassian product coordinate together and where should we study further? I admit I'm very newby here but I really want to learn.
Thank you for the advice