Hello.
I want to perform an upgrade from Jira 4.4.1 to Jira 7.10.
I read the Atlassian Documentation and I found out the upgrade path:
Jira 4.4.1 -> 4.4.5 -> 6.4 -> 7.0 -> 7.10.
Documentation:
In my Jira 4.4.1 I have some plugins installed.
Some of them might not be present in Atlassian Market for some versions of Jira which I will make the upgrade (4.4.5, 6.4, 7.0).
So what should I do when I am performing the upgrade? Should I upgrade the plugins as well for each version of Jira that is in my upgrade path or should I only install the plugins at the end of the upgrade (in Jira 7.10) ?
What do you think about this?
I was trying to make the upgrade trying not to loose any data, if that's possible.
We've tried some migrations like this a few times before and the process should look like: