I am using a Kanban board in Jira and would like to view original estimates on an epic level? We are adding estimates to each ticket within the epic and would like the ability to have those estimates rolled up on to the epic level without having to do so manually? The same for work logged. We log work on a ticket level and would like that sum added/rolled up on to the epic itself.
Hello Mariah,
The Epic Sum-up plugin can provide you with this information.
Please, start a free trial and check if this is what you are looking for.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.