Hi
We 1 project that needs work done from more than 1 team. So in the main project, all the stories will be created and then moved to whatever team will be doing the work.
The PM still needs to see in what state the main project is. Is it all possible in JIRA 5 to have 1 issue cloned to another project in such a way that any changes done on either issue will reflect on both?
Thanks Guys,
Juan
No. An issue belongs to a single project.
The best you can do is duplicate the issue and then link it to the original, then you'll need to find or write something to keep the two in synch.
Jip....thats what I thought.
Is there a plugin that can do this, that you are aware of?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Not that I know of.
Most places don't see the point of having duplicates. If they really need a duplicate issue in another project, they tend to create a "stub" and link it to the original with a message saying "go look over there". Problem with trying to keep two issues in sync is that you have to code for every type of change - it gets long and messy quickly.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.