Hi,
Reading upgrade notes from https://confluence.atlassian.com/display/GH/GreenHopper+5.10.6+Upgrade+Notes
I'm unsure if I can upgrade directly from 5.6.8 to 5.10.6.
As upgrade notes states 5.8, does that mean that upgrade path requires to go through GH 5.8
first (and thus JIRA 4.4.3 which is the prerequisite of GH 5.8)?
Regards,
Gilles
Hi Gilles,
There is no problem in upgrading from GH 5.6.8 to GH 5.10.6. You will need to upgrade your JIRA though.
At the bottom of the Greenhopper 5.10.6 Upgrade Notes, you can see the following:
In addition to the above, please read the GreenHopper 5.8 Upgrade Notes and the Upgrade Notes for every version you are skipping during the upgrade. The complete list of Upgrade Guides is available here.
Hope it helps!
Cheers,
Clarissa Gautério
Atlassian Support
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.