You're on your way to the next level! Join the Kudos program to earn points and save your progress.
Level 1: Seed
25 / 150 points
Next: Root
1 badge earned
Challenges come and go, but your rewards stay with you. Do more to earn more!
What goes around comes around! Share the love by gifting kudos to your peers.
Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!
Join now to unlock these features and more
The Atlassian Community can help you and your team get more value out of Atlassian products and practices.
I have two scrum boards in the same project. ‘Grp-EngLeads’ has the permission to Manage Sprints. This is a project-wide setting, but people in that group are only able to manage one of the boards. What am I overlooking? Filters and boards are shared and visible.
what is unique about the second board? is it possible that it includes issues from another project? if so verify that the grp-engleads has permissions in the other project(s).
There's nothing different between the two of them, which is perplexing. They're both the same prefix, with a different option selected from a dropdown to designate a team.
project = ABC AND "ABC Team[Dropdown]" = "Team One"
and
project = ABC AND "ABC Team[Dropdown]" = "Team Two"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.