Manage Sprints: Project permission not working

I have two scrum boards in the same project.  ‘Grp-EngLeads’ has the permission to  Manage Sprints. This is a project-wide setting, but people in that group are only able to manage one of the boards. What am I overlooking? Filters and boards are shared and visible.

1 answer

0 votes
Jack Brickey Community Leader Jan 27, 2021

what is unique about the second board? is it possible that it includes issues from another project? if so verify that the grp-engleads has permissions in the other project(s).

There's nothing different between the two of them, which is perplexing. They're both the same prefix, with a different option selected from a dropdown to designate a team.

 

project = ABC AND "ABC Team[Dropdown]" = "Team One"

and

project = ABC AND "ABC Team[Dropdown]" = "Team Two"