I would like to know if this is possible, because I have two status of done in my board and the burndown just consider the last column. But I need that the burndown consider the penultimate as well. Is it possible?
I'm afraid not, Jira sticks to "the single right-most column is done".
You can put more than one status in there though, so both your "done" type status will fit.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.