We have several build plans which first need to check out a significant amount of code via an SVN checkout stage, and that typically takes between 1-2 hours. Each subsequent plan execution takes significantly less time than that, however the build time estimates are skewed until about 30-40 builds later. Occasionally, a full-checkout is necessary, and the estimates are thrown off again.
Is there a way to have Bamboo exclude outliers or otherwise manually exclude longer builds from its estimated time to completion? Even on a per-stage basis that would be useful.
Remove the result. Of course then you lose the duration on your outliers.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.