Hi there, I'm new to Jira and have some troubles with the roadmaps
shortly: I need the epics to be prolonged automatically by one day, if they don't have the 'done' status. And linked epics to be moved to one day forward.
Which rules can I use to make this? Didn't find anything that fits the idea in the rules
in details: we are the animation studio and we need to optimize processes of our production. Generally we have 5-6 people in a team and 4-6 epizodes in production with the same chronology of production. Everyone is included in production of several epizodes simultaneously and often don't follow the deadlines strictly. That's why we need the automatically shifting schedule.