Hello,
I have a project with SLAs based on two different calendars to account for different time zones and responsibility split.
A->B is based on US calendar
B->C is based on India calendar
So when I set up a cumulative SLA, from A->C is there a way to account for this?
Or set up an SLA as a sum of two different SLAs?