Hi all,
I was wondering if the following is possible in Jira. We use a Jira add-on called 'Tempo' for time tracking. It works well, but what we would like to have added is the following:
We want to be able to set a due date at the epic level, after which no more time can be logged on the epic or on underlying issues linked to the epic. I found something on the internet that suggests using the 'jira.permission.work.denied' property, but that is without end date.
Does anyone have experience with using the 'Tempo' add-on, and would the above be possible?
Logging time with backwards compatibity should stay possible by the way, as long as the epic wasn't "closed" by that certain date.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.