In our previous pipeline provided (from which we are planning to move). We had a flexsiblity where we could say Step 1 should execute before Step 2.  This flexibility model the flow of steps. Also we could also have more then one Step be dependant of a single previous step. 

Our use case is for example we build a container and goes through dev  and staging after which the same docker container gets deployed to 3 different prod environments. But depending on the requirement we will deploy it to any one of the prod environments by trigging it manually. 

How would I setup my pipeline in bitbuck pipeline.

In our previous provided we would say that prod1 step should execute after step 3 and prod 2 step should execute after step3 and prod 3 steps should execute after step 3. In each of the prod steps I would enable manual trigger. 

It would be of great help if this type of flow is possible.

steps.png

1 answer

1 accepted

0 votes
Answer accepted
Justin Thomas
Atlassian Team
Atlassian Team members are employees working across the company in a wide variety of roles.
March 21, 2021

@t1279k Have you explored the option to use parallel steps with a manual trigger?