I want to rebuild from an earlier label in Bamboo, using TFS repository. Or have Bamboo rebuild from a Change-set or a previous date/time stamp?
Bamboo supports rebuilds from a changeset by Running a customized manual build where you can Choose the revision of the default repository that should be used:
Choose a repository revision to use for the build.
Note that:
- You can only choose revisions from the default repository.
- The build is not included in plan statistics or telemetry.
- SVN repositories use the revision number
- Perforce projects use the changelist number
- Git repositories use the changeset number
- Mercurial repositories use the tag
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.