As per the request – Below are the Rules (only for Open Status) needs to be followed.
Ø RULE 1- if the theme issue has 3 child issue called epic 1, epic 2 epic 3 - if all epics are moved to status called "funnel" automatically parent issue called "theme" should go to status open, or
Ø RULE 2: no epics in status called "funnel" (Funnel is epic first Status)
As per the request – For all Status Epics – We need to set totally 12 Rules for all the Status.
NOTE: Above rule are the status in funnel same as we need to set for all the status in epic based on the rule the parent issue status should auto trigger.
Could you please provide any script related to our requirement,