Rollup original estimate at Sprint level

James Naylor
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
March 15, 2021

I'm evaluating Jira as an alternative to my current APM tool.

Objective

In this other APM tool it adds the "work effort estimates" of each issue / bug / task / subtask (Deliverable) assigned to Iteration (i.e., sprint). So we assign the issues / bugs et al, to all future iterations (sprint) in order to get a rough order of magnitude end date. I.e., the tool calculates 25hrs per week per programmer, to that's 100hrs of work per 2 week iteration for 2 programmers. So based on priority we move each the deliverables to the iterations until they all assigned and that gives us a rough delivery date. We've been doing this for 20yrs and it's never failed us.

Question:

1. Is there something similar in Jira?

2. Can I display the accumulated Original Estimates at the sprint level?

 

Thank you in advance for any responses!

 

Cheers, James

1 comment

Comment

Log in or Sign up to comment
Omer Meshar
Contributor
March 21, 2021

Hi,
I am not sure you can do this in Jira without an add-on, but by using Structure you can achieve this, as shown here:

struct.png

As you can see, you can group issues by Sprint and have a column that calculates the sum of original estimates per sprint. 

Thanks,

Omer