I linked history A with the one blocked by B.
In the active sprint, I can move history A even before starting B, even though it is locked.
Is there any way I can not let history move A without ending B before?
Thanks
Not natively,
However you can set up a condition on your workflow to check for the linked condition status using a third-party app (probably a PAID one)
Check:
https://confluence.atlassian.com/adminjiracloud/advanced-workflow-configuration-776636620.html#Advancedworkflowconfiguration-conditions
https://marketplace.atlassian.com/search?product=jira&query=workflow
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.