I have two transitions that are going to the same status. For example, Transition A and Transition B both go to the status "Internal Review". Each transition has specific post functions, validators, etc. that will happen.
When I move the issue on the Kanban board to that particular status the column splits into two parts indicating each transition. Transition B is on the top section of the column and Transition A is on the bottom. Transition A is the one that 90% of the issues will be going through.
How can I make it so Transition A is on the top and Transition B is on the bottom?
