We work with native JIRA in which ROVO, Analytics are disabled (except for JIRA Automation). And we need to publish a report for leadership to showcase the work done vs the remaining/planned work (w.r.t. Sprints & Product Backlog).
In JIRA dashboard, none of the widgets allow using "Story Points" as an input parameter (even though the Story Point is configured as numeric field).
So, rather than integrating JIRA with third party tools (like Power BI etc., which incur cost), please suggest if there is a way to do these calculations within JIRA?