I have 3 projects that can be linked together: Support (TCST), Dev, OPS.
The normal flow is:
1. Support opens a dev ticket and links it to the support ticket.
2. Dev fixes the bug and creates an OPS ticket for deploy
3. Dev links the OPS ticket to the Dev ticket.
When Dev links that OPS ticket, I want to link the same OPS ticket back to the support ticket that's already linked to the Dev ticket.
This is what I've tried, but it's not right.
