Software maturity is measured by the number of open cases over time.
So I need a chart as below (this shows a project that is just cranking up so very immature code base) that is configurable so I can ask, by project, by a range of milestones, by area (our projects typically have 5 or more areas that tickets can be classified as) and a time range (typically the entire project).
How you do that in jira?
