Hello, I want to create this logic if it is possible:
When all the tickets linked by "is tested by", are in status = Ready for Testing,
Move all tickets to IN QA status.
I tried with this logic but it is not working

In this case I want the 3 tickets to be moved to IN QA, when they are all in ready for testing status
Is it possible?
Thanks