I have the following structure
Story (Field: Progress)
- Subtask 1 (Field: SP, Field: Progress)
- Subtask 2 (Field: SP, Field: Progress)
I want to know if it is possible with Jira Automation to update Story Progress based on its subtask but doing an operation with both fields of the subtasks.. something like this:
Story.Progress = sum((subtask.sp/totalStoryPoints)*subtask.progress)