I am using a global rule to assign the active sprint to an issue whenever a specific label is added to the ticket.
However, I am unable to make the rule assign the right active sprint to the issue. Am I stuck with making multiple rules with different active sprints for each project or is there solution to reference the active sprint of a project that the trigger issue is in?