Forums

Articles
Create
cancel
Showing results for 
Search instead for 
Did you mean: 

Improving Jira Search and Reporting with Calculated Table Fields

If you’ve ever tried to calculate ROI or progress percentage in Jira, you’ve probably ended up with a headache and three tabs full of “Jira custom field formula workaround” searches.

aidk92.jpg

The reality is this: Jira is great at tracking work, but calculations? Not so great. Sometimes, you just want to ask a simple question like, “How much budget have we burned?” or “What’s the score of this initiative?” and actually get an answer without exporting data to Excel. So whether you’re building a custom report in a Jira work item or simply trying to view performance at a glance, the lack of flexible calculations makes it harder than it should be.

So let’s talk about how you can get there minus the headaches! 


Why Custom Calculations Matter in Jira

Teams use Jira for everything. From product roadmaps to sprint management to bug tracking to budget tracking. But as soon as you need derived numbers like ROI, variance, or weighted progress, Jira’s native capabilities fall short.

For instance, the marketing team might want to calculate ROI by dividing revenue by campaign cost. Meanwhile, a project manager might need a live field that sums up story points from subtasks. These are extremely basic needs, yet Jira can sometimes make it feel like a mountain of effort just to get what you need. When getting your reports or calculations depends on manual exports and static dashboards, data quickly becomes outdated

The problem with this is straightforward: the more tabs, spreadsheets, and apps you juggle, the harder it gets to trust what you’re seeing. 

 


Why Jira’s Native Features Fall Short for Custom Calculations

I’m not saying Jira as a tool is entirely useless because that would be entirely unfair! But the fact of the matter is, Jira wasn’t built to think in formulas. It’s built to track work, plain and simple. 

 

So when teams start needing calculated values, they usually run into one of these creative solutions, all of which make it difficult to calculate field values in Jira directly:

#1 Scripting Fields

Taking advantage of scripts is a powerful workaround, especially if you're familiar with tools like ScriptRunner or Jira Automation. But this doesn't come easy, as it relies on technical know-how. So if you aren't fluent in these, you might be stuck waiting around for someone who is. 

#2 Dashboard Workarounds

Dashboards can visualize totals and progress bars, but they don’t calculate inside work items themselves. Sure, you can show story point burndowns or progress charts, but try to display a cost variance or ROI formula, and you’ll end up copying data elsewhere.

#3 Exports and Spreadsheets

This is the classic move: dump everything into Excel or Google Sheets. While you can technically calculate everything you might need there, it will be disconnected from your Jira instance itself. You’ll have to export again tomorrow, and again next week, because your “real-time” report is already stale a few minutes later. 

 

I will admit that these workarounds get the job done, but not without a cost: wasted time, fragmented data, and too much dependency on technical roles. What teams really need is a way to perform calculations inside Jira, minus the complicated setups, excessive exporting, and context loss. 

 


The Smarter Way: Do the Calculations Inside Jira with Excel-like Tables for Jira

That’s where Excel-like Tables for Jira changes the game. It brings spreadsheet logic straight into your Jira issues, so you can calculate, summarize, and report in real time without ever needing to leave the platform.

 

Here are some of the things you can achieve with the app:

ETJ Highlight 3.gif

 

  • Create tables inside issues and use standard formulas to calculate totals, averages, or progress percentages.

  • Reference Jira formulas and fields such as story points, estimates, or custom values within those formulas.

  • Automatically write results back to Jira fields to keep data consistent across dashboards and reports.

  • Build tables that track project budgets, time variance, or ROI with live updates as issues move.

  • Import existing Excel files to continue working collaboratively in Jira without losing formatting or formulas.

  • Use pivots and filters to view results by assignee, project, or timeframe for deeper insight.

  • Keep all data tied to its original issue so reporting stays transparent and traceable.

Under the hood, Excel-like Tables for Jira exposes table data through a secure REST API, so scripting apps like ScriptRunner and external services can consume calculated values directly. 

That’s the real shift. Excel-like Tables for Jira turns Jira from a place where teams simply record progress into a place where they actively calculate and understand it, unlocking a more advanced, data-driven way to track work in Jira.


 

But don’t just take my word for it. Sometimes these things are best experienced firsthand. Give it a try today! 

 

Try Excel-like Tables for Jira

0 comments

Comment

Log in or Sign up to comment
TAGS
AUG Leaders

Atlassian Community Events