Hello, fairly new JIRA user but long time MS Project / Project manager.
My groups projects typically run 12 to 24 months in duration. Initial thought was to an epic per project. There are roughly a dozen to 18 Issues per project.
Seems Mgt is preferring to break the Epics down into 2/3 month increments. Checking on what other folks are seeing as norm for Epic duration for longer duration projects ?
Thanks