I am very new to JIRA Portfolio, and am trying to figure out how to build a five to six level deep hierarchy. I can use some help. By the way, I recognize that we probably shouldn't need to have such a deep hierarchy to begin with, but let's side aside that debate for now :)
So, in JIRA Portfolio hierarchy settings, I added two new levels. Let's call them Level 1 and Level 2. By default, it already has three levels in there. So, that makes for total five levels. After saving the settings, I created a new JIRA portfolio plan and tried to add some dummy items to build out a five level deep structure. That's where I am getting confused because it only gives me the choice to create an Epic and then from there two levels below it. So, no matter what I try, it limits me to three levels instead of the five levels that I am expecting.
I have used JIRA a lot before, but am new to JIRA portfolio, so please assume that I don't know anything about it. I figure I am missing something that is obvious.