In Structure, I can set up a synchronizer to automatically place linked issues "under" the "parent" issue. I'm using Query Issues and want to be able to sync these in Structure automatically instead of manually moving them. How are the issues "linked"?
Structure provides the capability to synch with: filter, Linked issues, subtasks, or JIRA Agile.
Hello, i will try to fix it as soon as possible
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.