I would like to create a "Milestone" issue type and allow that to show up on the timeline at the same level as epics.. is this possible?
Hi @Kristine Gemici
In Planyway for Jira you can visualize issues of all types on the sale timeline without hierarchy. You will be able to distinguish them by color.
Hi @Kristine Gemici
From my experience you can replace Epic or add hierarchy above epic but not have issue type equal to epic.
I believe that the Epic is the project timeline top level and is needed for project timeline. Again you can edit the epic and change the name in the hierarchy configuration but I have yet to be able to have another issue type at the same level.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kristine,
I might be possible. See if you can add it to the Issue Type Hierarchy at the same level as your Epic.