I think that the overall progression bar based on the statuscategory of the linked Delivery Jira tickets is not working IF you link to a ticket that is higher in the Jira Hierarchy than Epic.
I think it is not exploring the entire hierarchy when calculating the overall progress.
I have mixed a single 'Feature' that contains 2 epics and several story tickets, plus two other story tickets directly. The overall number of tickets it is counting is 4 (e.g. 2 of 4 in progress) So it seems the 2 Epics and the two direct stories are the '4'. it is ignoring the stories under the epics.
is this by design?
Hi @Richard_Donnell there are 2 options for calculating delivery progress:
Will either of those 2 options work in your scenario?
Hi Rohan, thanks for the quick reply.
That's a really good question. Option 1 would not work for me because I have linked mixed level tickets.
Option 2 - this is what I believe has prompted my question, as that also does not work for my, I think real world, scenario - teams delivering against ideas in an organisation work in different ways, and there may be story level individual tickets in the mix alongside Epics and also Higher level tickets) - in my scenario, looking at the Jira hierarchy attached, I have a level 2 ticket with Epic and story tickets underneath, and 2 Story tickets directly attached.
Perhaps a third option of 'count all the 'Story' level tickets in the attached set of tickets would hit the spot?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@Richard_Donnell got it! Thanks for sharing that context.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.