Create
cancel
Showing results for 
Search instead for 
Did you mean: 
Sign up Log in
Celebration

Earn badges and make progress

You're on your way to the next level! Join the Kudos program to earn points and save your progress.

Deleted user Avatar
Deleted user

Level 1: Seed

25 / 150 points

Next: Root

Avatar

1 badge earned

Collect

Participate in fun challenges

Challenges come and go, but your rewards stay with you. Do more to earn more!

Challenges
Coins

Gift kudos to your peers

What goes around comes around! Share the love by gifting kudos to your peers.

Recognition
Ribbon

Rise up in the ranks

Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!

Leaderboard

Come for the products,
stay for the community

The Atlassian Community can help you and your team get more value out of Atlassian products and practices.

Atlassian Community about banner
4,639,450
Community Members
 
Community Events
196
Community Groups

How's the "Jira Project" field in the release vehicle populated?

Edited

I have a few Release vehicles (RV) for a Program and one of the RV has the  "Jira Project" grayed with the Jira Project is filled in.  Some other RVs  are grayed, with "Jira Project No Sync".  And I can not add the Jira Project to it.  

I am wondering how does the "Jira Project" field get populated and how can I force data in this field.

Thanks in advance for your wisdom.

 

ADDITIONAL INFORMATION:

Why is the Jira Project field drop down unavailable in certain cases, it's already filled and can not be changed, and in some cases it is filled but can be updated from a drop down.

What drives it?

We have program identified and all teams are connected in Settings.  

HELP!!

1 answer

The RV with a current Jira Project name listed are ones that have synced with Jira.  If your connector settings are configured with the setting to allow RV(fixed versions) to sync, then that information will sync.

 

  • Allow Release Vehicles to sync with Jira Fix Versions. Select Yes to allow Jira fix versions to synchronize with Jira Align. If this option is turned off, fix versions do not synchronize. 

The ones listed in Align with "no sync" next to Jira project simply means that the information is not configured to an existing Jira project.  In my instance, I have the ability to click on the dropdown and select a jira project I want the RV to sync down to.  This will be dependent on if the Program Increment includes programs that have jira projects already configured to sync.

Thank you. Configuration is correct but it's still not working for all RVs.  

Like Sunny likes this

Please see my updates to the original question. Thanks.