jira
Discussion List
-
Public access to single issue
Is there a way to allow public access to a case only if you know it's secret url? We are switching from FogBugz and one feature they have that is very handy is even a logged out user can access an issue if they have a special url. For example: http://jira.mysite.com/browse/SUP-1819?key=SoMeRaNdOmKeY This allows us to share…
-
Pie-chart "SUM" function? Prioritization for a set of Epics/Stories
Background: See https://answers.atlassian.com/questions/230304/percentage-breakdown-on-prioritization-for-a-set-of-epics-stories?page=1#230309 Creating a pie-chart for back log is no problem, but I'm missing one information field. Estimated time. Meaning that next to each Moscow prio % I would like to know how many hours…
-
Sum of story points of stories at the epic level?
When I set the Epic to have 10 story points, it does not sum up with SP of its stories. So I can have an epic witj10 SP and two stores (1SP and 5 SP). In the planning board, the epic shows 6 SP, disregarding 10 SP for the epic itself. Is that correct? Or..why should I even estimate epics in story points?
-
How to add time estimates to Issues/Epics/Stories, etc
Greetings Folks, I am evaluating JIRA and JIRA Agile for our team so therefore these questions may be obvious to seasoned pros using these products. Please bear with me as I learn these products! First, Do I need the Agile component if I want to manage projects and track issues? I think I am missing something but I can not…
-
Edit permission by issue type
Is it possible to configure the "Edit" permission by issue type? We have an issue type that only certain Project Roles should be able to create/edit, but we don't want to prevent users from creating the other issue types. Can I configure this in default JIRA? If this isn't configurable in JIRA, are there any plugins out…
-
Dont find story points for backlogs or Total story points for every EPIC on Agile dashboard?
I dont see any story points for backlogs similar to Sprints on the Agile dashboard. I also dont see total story points for every EPIC as well as the Grand total for the Dashboard.
-
For Parent Story, Story points should get auto populated from all child stories. It should be sum of story points of all Child stories
For Parent Story, Story points should get auto populated from all child stories. It should be sum of story points of all Child stories
-
Attributes of base DN I need to connect JIRA to LDAP aren't supported?
Hi. I've been trying to connect our JIRA to an LDAP directory for authentication. The Base DN of our LDAP server should be "ou=people, o=yp, c=jp" (I ‘ve got it by using LDAP Browser). Using that DN for setting, the connecting test has been OK. But test to retrieve user information has failed. The error message says:…
-
JIRA active directory is not syncing
I have an active directory on my JIRA instance and it is set to sync every hour. it will sync for awhile then it stops. I have run test and the connections are fine. Any idea why it would randomly stop syncing? ad sync LF.png
- Is it possible to create and link automatically Test issues to User story (by acceptance criteria)?
-
Velocity compare multiline string problem description-edit
Hi, I'm having trouble in comparing multi-line string. The goal is to compare the description string in case of multiple project. I have several projects like this: - Project1 - Project2 I have edited the description-edit.vm file like this: #set ( $description_project1="template project1")#set (…
- How do I write code to create a Project, issues and subtasks in Jira?
-
calendar free addon for leave Tracking in jira
i am looking for leave calendar in Jira. please let me know the free addon for leave tracking.
-
Can't connect to Jira in browser
Hello, I need help with Jira; it's not responding when I attempt to connect via my browser now. Here's some background information: I installed Jira in a 64bit Ubuntu 12.04.03 VM; I'm doing a 30 day evaluation. The installation went smooth, everything worked great, I could connect right away. It was running slow, however.…
-
how do i log out
i think i logged in as the wrong account. i have removed the JIRA URL from my password manager in chrome and I get no data on the page and when i click the login link nothing happens.
- how to fetch data from JIRA installed on cloud?
-
I have JIRA6.2 and I want to upgrade it to JIRA6.5. What are the steps needed for this?
I have JIRA6.2 installed on our server. I need it to upgrade it to JIRA6.5. We need following informations for this activity. * What are the steps involved in this? * What are the issues which we might encounter? * How much time it may take? * What are the conditions for this upgrade? Thanks in advance.
-
Slow jira - some calls to PermissionManager.hasPermission() take 1.5s
Hi, Our JIRA web pages take long to respond since some days (all clicks anywhere in the UI). I enabled profiling and found out that the cause might be PermissionManager.hasPermission(). There are several of these calls fort each webpage click, the some (not all) of these calls need 1.5 seconds. I am confident that this is…
-
Why are my csv imports not formatting the Description in 6.4?
We have a library of CSV files that we import regularly. Since upgrading to 6.4, they are not respecting the formatting in the Description field. If I copy and paste the description from the CSV file, it formats correctly. These all worked before upgrading to 6.4.
-
Encapsulating a customer project
Seeking advice. I use a custom integer field, call it, JobID, and let it lie on parent and subtask. At each workflow transition for each subtask, a post trigger copies the parent's JobID to the subtask's JobID field. This JobID is used to form the basis for a "customer project" - a collection of work to be built - this is…
- How can I set the default story point value on a per project basis?