Hi all,
I want to see what issues have been added before the sprint was started. Basically the commited items. How can I do that?
I can see them in the sprint report. The ones added after the sprint started have a small star that say "Issue added after the sprint was started". Basically all the ones that do not have the * sign are the ones I'm interested in.
Thank you