Hi All,
We would like measure KPI's in JIRA.
We would like to have 3 KPI's per initiative. 2 text fields for each KPI. 1 for the KPI itself and second for the KPI status (0%,25%,50%,75%,100%). The status could be a text field but we prefer a drop down with those options.
We would like to display it with a gauge measure.
Does anyone have any idea how i can create such report??
Thanks,
Sivan